In 2024, AO Giprotyazhmash started designing the building for thermal and mechanical treatment of forged rolls for PJSC Magnitogorsk Iron and Steel Works. The new facility will be used for the thermal and mechanical treatment of work and backup rolls of cold and hot rolling mills. In addition, it is planned to perform mechanical processing of transport containers for storing nuclear waste, as well as heat treatment of other products in accordance with the production programme.
The project is being implemented on the basis of a technical assignment prepared by FSUE I.P. Bardin Central Research Institute of Ferrous Metallurgy.
The construction of the complex is underway on the site of the former foundry shops of MRK LLC, located on the territory of PJSC MMK in Magnitogorsk.
The design capacity of the future production will be 11,765 tonnes of products per year. Of these — 5,895 tonnes of forged work rolls and 5,876 tonnes of backup rolls for cold and hot rolling mills.
To date, the main foundations and the steel frame have been erected, work is underway on fire protection and painting of structures, installation of external stairs and facade panels. The bases for skylights and the roofing profiled sheet have been installed, and foundations for heat treatment furnaces, quenching tanks and machine tools have been concreted. The installation of heat treatment furnaces is underway.