In August 2024, specialists of AO Giprotyazhmash started work on the facility «Technical re-equipment in the steelmaking shop No. 8 with the creation of special metallurgy section No. 2» on the territory of PJSC Izhorskie Zavody in Kolpino.
The technical re-equipment of steelmaking production is an important step towards improving the efficiency and competitiveness of the metallurgical industry. In this context, steelmaking shop No. 8 in Kolpino has become the object of large-scale transformations aimed at creating a special metallurgy section. The section will specialise in the production of high-quality alloys demanded in various industries, such as aviation and nuclear power. The increase in output by shop No. 8 is provided for by the technical assignment for 18,000 tonnes of castings per year.
The project provides for the replacement of lifting mechanisms with cranes of greater capacity and the replacement of all crane runway beams with more powerful ones. At the same time, the existing production operating in adjacent bays is taken into account. It cannot be stopped. The main production facility — the electroslag remelting unit — is placed on foundations whose base is buried by 6.5 m.
The technology for these furnaces and the furnaces themselves are designed by scientists from Novosibirsk — AO SKB Sibelektroterm, specialising in arc steelmaking furnaces, electroslag remelting furnaces and other technological equipment.
The construction is nearing completion. To carry out designer supervision, specialists visit the site weekly and resolve issues arising from the contractor. Existing structures and operating production make their own adjustments.