Greenfield construction of a number of facilities as part of the Moscow Central Ring project, including:
- A washing facility and a stabling and servicing station for electric trains at Andronovka station with a total capacity of the servicing yard of eight ten-car Lastochka electric trains.
- A stabling and servicing station for electric trains and a check-in and rest facility for locomotive crews at Likhobory station (Bratsevo Park). The construction is carried out in two areas: in the left and right yards. The total capacity of the servicing yards is four (the left yard) and three (the right yard) ten-car Lastochka electric trains.
- A stabling and cleaning station for electric trains and a check-in and rest facility for locomotive crews at Belokamennaya station. The construction is carried out in two areas: in the area of the service building and in the left yard. The capacity of the left servicing yard is six ten-car Lastochka electric trains.
- A stabling station for electric trains at Presnya station. The total capacity of the yard is two ten-car Lastochka electric trains.